EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
phowe
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (415)
Research
- (1)
Workshop
- (2)
Empennage
- (2)
Fuselage
- (71)
-
Windshield and Skylight
-
Windshield and Skylight
-
Windshield and Skylight
-
Ribs for Skylight...
-
Rear Fairing
-
Patch Hole in bottom...
-
Doors
-
Doors
-
Tail Station Closeout
-
Belly Fairings
-
Belly Fairings
-
New Header Tank
-
Install windows in...
-
Trimmed Wing...
-
Station 10 and 11...
-
Reattached the boot...
-
Added more rivet...
-
Boot Cowl, Attach...
-
Boot Cowls
-
2 more coats of...
-
Top Boot Cowl Skins...
-
Floorboard
-
Side Boot Cowls
-
Floorboard
-
Bottom Cowl skin
-
Firewall
-
added missing...
-
Installed bottom and...
-
Rivet call outs
-
Taped stringers to...
-
Rivet hole locations...
-
Trimmed the side...
-
Fitted, Trimmed and...
-
Started to fit side...
-
Flipped the fuselage...
-
Cut the stringers...
-
Flipped Fuselage and...
-
Finished riveting...
-
Rivet top skins to...
-
Tailcone skins
-
Tailcone stringers...
-
Front Top Skins
-
Front Tailcone Top...
-
Fitting top skins...
-
Interior - Baggage...
-
Test glued a piece...
-
Edged the bottom of...
-
S4 Closeout
-
S4 Closeout
-
Clecoed top skins to...
-
Edged the Top skins
-
Window Supports (S3...
-
Fabricating window...
-
Drilled the locking...
-
Assembled Rudder pedals
-
Baggage Area
-
Worked on the aft...
-
Rudder pedals
-
Worked on assembling...
-
Work on the Baggage...
-
Rudder cables
-
Tailcone to Fuselage...
-
Cage to tail-cone work
-
Mounting cage to the...
-
Tailcone - riveted...
-
Side and top...
-
Attached the station...
-
Tailcone - riveted...
-
Tailcone - Bottom...
-
Fuselage Stations
Firewall
- (11)
Tail Feathers
- (37)
Wings
- (86)
Controls
- (11)
Avionics
- (30)
Lighting
- (13)
Instrument Panel
- (6)
Landing Gear
- (16)
Engine
- (30)
Propeller
- (7)
Fuel System
- (18)
Interior Finish
- (46)
Rigging
- (6)
Paint / Decals
- (10)
Inspection
Tools
MISC
- (12)
Builder Name:
Philip Howe
-
Project:
Rans - S-21 Outbound
-
VIEW REPORTS
Total Hours:
1711.75
Total Flight Time:
6
Total Expense:
N/A
Start/Last Date:
Oct 19, 2020 - No Finish Date
Engine:
Rotax 915is
Propeller:
Whirlwind
Panel:
Dynon
Friendly URL:
https://eaabuilderslog.org?s=phowe
Home or Last Project Picture
Oct 21, 2020
Fuselage Stations
- (6 hours)
Category: Fuselage
Completed Station 4,5,6 and 8. Worked on and almost finished Station 10
IMG_3924.jpg
Resized952020102095134103.jpg
Resized952020102195135536.jpg
Resized952020102195140706.jpg
Resized952020102195151608.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.